
Platforms and walking
The steel platform is the face of the working lift. Perforated walking and stair platforms carry lift access.

Platforms, guardrails, stairs and connections. They are part of the main system, not boards nailed on afterwards. Hire, sale and erection.

The accessory list depends on the main system. The framework below is for survey before quotation; net counts are locked in the survey note.
| Item | Value |
|---|---|
| Groups | Platform, guardrail, toeboard, stair, connection |
| Compatibility | Same family as H-type, ringlock, table form and trio sets |
| Hire unit | each or set |
| Site rule | TS EN 12811 guardrails and access; missing parts forbidden |
| Delivery | On the same list as the main-system quotation |
| Stock | İzmir Torbalı, İstanbul Tuzla / Orhanlı, Kosova Ferizaj |
An accessory is not scaffolding on its own. Platforms, guardrails and stairs are part of the backbone; missing parts stop the set on site.

The steel platform is the face of the working lift. Perforated walking and stair platforms carry lift access.

Edge protection is part of the lift. Boards nailed on afterwards do not meet the TS EN 12811 guardrail rule.

Access between lifts, wedges, pins and base plates are on the list. A missing wedge is the first stoppage.
The facade backbone is H-type; the formwork face is trio or column-wall; support below is table form or telescopic. Platforms and guardrails are this page’s subject.
| Case | Right system |
|---|---|
| Facade backbone | H-type guarded facade scaffolding |
| Formwork face | Trio or column-wall formwork |
| Falsework support | Table form or telescopic prop |
| Platforms, guardrails, stairs | Scaffolding and formwork accessories |
What a scaffolding accessory is, which parts belong in the set, how price is read — short answers.
Platforms, guardrails, toeboards, stairs, diagonals, base plates and connectors. They are part of the main scaffolding or formwork system, not timber guardrails nailed on afterwards. Missing accessories leave a certified backbone incomplete on site.
Platform on the working lift, guardrail and toeboard at the edge, stairs between lifts, base plate on the ground, wedge or pin at the node. Brackets, walkways and anchors follow the project note. All are chosen from the same family.
On a full-set quotation, guardrails and platforms are read with the backbone. Spare wedges, extra stairs and brackets may be separate lines. Collecting parts on site produces downtime; the list is locked on survey.
Small parts are read per each, platforms and stairs per set. Reference ranges are on the price page. They can be included in the main scaffolding/formwork quotation; the firm list comes after survey.
No. Rosettes, H frames and wedges belong to the same language. Undocumented mixed parts ruin the lock and wipe the advantage on day one. 3B İskele issues stock compatible with the main system.
Reach the 3B İskele team for survey, rental, sales and erection. Don’t close quantities by guesswork — we’ll pin down the right system together. Use 3biskele.com or WhatsApp for a quote.
Izmir Head Office · Torbalı / Izmir
Istanbul Factory & Warehouse · Tuzla / Orhanlı
Kosovo Warehouse · Ferizaj