Facade Cladding Services — 3B İskele
Services

Facade Cladding Services

ETICS, stone, composite and curtain wall. Scaffolding and application under one roof; brackets and anchors follow the calculation.

ETICSStone claddingCompositeCurtain wall

500+

Completed Projects

15+

Years of Experience

100%

Safety Focused

7/24

Technical Support

Facade Cladding Services

How does facade work run?

First facade type and detail, then scaffolding and brackets, then application lifts. Reverse order makes you erect the scaffold twice.

  1. 1

    Facade type and detail

    ETICS, stone, composite or curtain wall is chosen. Thickness, hangers and joints set the scaffold allowance.

  2. 2

    Scaffolding and brackets

    On a straight facade H-frame is the backbone. 35 / 65 / 105 cm brackets are chosen from need; a gap is not closed by guesswork.

  3. 3

    Application lifts

    Insulation, cladding or glass units go in lift order. Guardrails stay on the working lift.

  4. 4

    Check and strip-out

    Joints, anchor traces and the pedestrian route are closed. The scaffold comes down in reverse after last-lift approval.

What sits in a turnkey package?

  • Facade-type survey and take-off
  • H-frame scaffolding + required brackets
  • ETICS / stone / composite / curtain-wall application
  • Programme and site layout
  • Strip-out and handover check

Separate item or out of scope

  • Architectural facade design and structural facade calculation (primary structure)
  • Ringlock industrial geometry (separate system)
  • Interior works
  • Municipal permits and building-control fees

Scaffold only, or scaffold + application?

Two separate contractors cannot share the same anchor hole. When responsibility breaks, the facade waits.

TopicSeparate crews3B under one roof
ProgrammeScaffold waits, application waitsOne sequence, one survey
Bracket allowanceEnds up short laterTo cladding thickness
AnchorsHits the application holeLeft planned
GuardrailsApplication takes them on and offStay part of the lift
Strip-outComes down early, work left behindAfter last lift

Which facade, which scaffold allowance?

ETICS, stone and glass do not want the same working width. Brackets and load change.

ETICS and paint — Facade Cladding Services

ETICS and paint

On straight housing, H-frame facade scaffolding with guardrails is the backbone. Allowance is usually narrower.

Stone and composite — Facade Cladding Services

Stone and composite

Thickness and hangers grow the bracket. Platform load is different from the ETICS factor.

Glass and high-rise — Facade Cladding Services

Glass and high-rise

Unit size, wind and anchors sit in the same note. Netting from memory is not enough.

Frequently asked questions

Which facade types, is scaffolding included, is H-frame enough — short answers.

Which works does facade cladding cover?

At 3B İskele it covers external ETICS, natural and mechanical stone, aluminium composite panels and curtain-wall application. Scaffolding is under the same roof. Architectural facade structural design belongs to the building primary structure; site anchors are tied to the scaffold calculation.

Is scaffolding included in the facade quote?

On turnkey, H-frame facade scaffolding with guardrails, brackets and strip-out are discussed in the same package. Line items are visible in the quote; there is no “hidden scaffold”. Application only or scaffolding only can also be requested separately.

Is H-frame enough for every facade cladding job?

On straight housing, offices and repeating facades, yes. Silos, vessels, inclined steel and heavy industrial geometry need ringlock. On a mixed facade both systems can sit side by side.

Is ETICS the same as stone cladding?

It is not. Thickness, hangers, load and bracket allowance change. The same scaffold set is not enough for every detail. Take-off is not written before survey locks the facade type.

How long does the work take?

Number of lifts, facade type, weather and anchor time decide. ETICS can progress faster than curtain wall. Strip-out is tied to last-lift approval. Net duration sits in the programme after survey.

In which regions do you work?

From Izmir Torbalı, Istanbul Tuzla / Orhanlı and Kosovo Ferizaj bases. Site distance changes logistics and crew planning; it is visible in the quote.

Talk through your project with 3B İskele

Reach the 3B İskele team for survey, rental, sales and erection. Don’t close quantities by guesswork — we’ll pin down the right system together. Use 3biskele.com or WhatsApp for a quote.