Rental
30–50 ₺
m² / month
+ VAT. Full set, by duration and height

Rental 30–50 ₺/m² + VAT. For 1,000 m²: 30,000–50,000 ₺ + VAT. Erection, duration and height shift the unit. The firm figure comes after survey.
Rental
30–50 ₺
m² / month
+ VAT. Full set, by duration and height
1,000 m²
30,000–50,000 ₺
+ VAT
30–50 ₺/m² × 1,000 m²
Sale
Quote
project / stock
Galvanizing year and take-off are discussed

H-frame facade scaffolding with guardrails
Facade scaffold rental is 30–50 ₺ per m². At 1,000 m² that band is 30,000–50,000 ₺ + VAT. The unit shifts with facade height, hire period, erection-dismantling scope and haulage distance. Erection-dismantling is a separate item.
Guardrails, platforms and toeboards are read as a full set; it is not a “cheap m²” price for a tower without guardrails. Sale unit price comes in the quote by stock age. 3B İskele uses the same calculation language from Izmir Torbalı, Istanbul Tuzla / Orhanlı and Kosovo Ferizaj stock.
Prices are + VAT. Ranges are a reference; the firm quote is locked after project survey.
Facade scaffold rental is spoken per m². 1 m² is 30–50 ₺; 1,000 m² is 30,000–50,000 ₺ + VAT as a reference; survey changes the quote.
| Item | Price range | Unit |
|---|---|---|
| Facade scaffolding rental + VAT. 1,000 m² → 30,000–50,000 ₺ + VAT | TRY 30 – TRY 50 | m² / month |
| Erection / dismantling service After survey and anchor plan | TRY 18 – TRY 35 | m² (one-off) |
The same facade does not hold the same m² with a different duration or anchor plan. Where you land in the band depends on the site note.
01
Facade area is measured in m². Brackets are a separate item; they are not added from memory.
02
On short jobs the unit rises; at 6 months+ and high take-off the unit falls. Extra months are discussed if the period extends.
03
Height, anchors, wind cladding and night shifts inflate the erection line.
1,000 m² is used to make the figure concrete. Your facade may sit at 30 or 50 ₺/m²; prices are + VAT and this example is not a quotation.
| Item | Calculation | Result |
|---|---|---|
| Floor band (30 ₺/m²) | 1,000 × 30 ₺ | 30,000 ₺ + VAT |
| Ceiling band (50 ₺/m²) | 1,000 × 50 ₺ | 50,000 ₺ + VAT |
| Erection + haulage | Survey and distance | In the quote |
The sample is a 1,000 m² rental line. A 30 ₺ floor or 50 ₺ ceiling shifts the same take-off by 20,000 ₺. Prices are + VAT. This table is not a quote.
The price page is a hire reference. Purchase is discussed separately by duration and repeating work. Hire vs buy guide
| Case | Choice | Note |
|---|---|---|
| 3–8 month single site | Rental | Stock cost is high |
| Repeating facade work | Core stock + peak hire | Standing hire is expensive |
| Guardrails / certificate | TS EN 12810 on rental sets too | Same rule |
| Yard, wastage, maintenance | With the company | With the buyer |
| Cash outflow | Monthly | Upfront / deferred sale |
The m² band is the same language. Haulage and stock proximity change the quote line. Prices are + VAT.
Headquarters and Aegean dispatch. On short distance the haulage line falls.
Plant and yard. Asian-side and Marmara sites are fed from here.
Balkan supply. Border and duration open the haulage row separately.
* Results are approximate based on 1000 m² standard consumption. Contact us for a firm quote.
Calculator type
Note
This calculator applies to straight facades. Recessed, parapet or balcony elevations may need brackets or openings in the facade, so the technical team must review the project and produce the take-off.
Project details
Enter m² only to see the standard consumption list.
Material List
Enter area (m²) to calculate
1000 m² → 200 frames · 260 boards · 300 ledgers
H-frame scaffolding hire price, m² scope and the hire–sale split.
Facade scaffold rental is 30–50 ₺/m². For 1,000 m² that reads 30,000–50,000 ₺ + VAT. Erection-dismantling is a separate item. High-rise, short duration, netting-sheeting and long haulage pull the unit up. The firm figure is in the quote after survey.
A full set has frames, ledgers, braces, steel platforms, guardrails, toeboards and base jacks. Erection crew, haulage, netting and brackets are separate items. A “cheap m²” without guardrails is not this page’s price.
On a 3–8 month single job, rental; on repeating facade work, a core stock. Peak demand is still hired. The sale unit depends on stock age; this page is a rental reference.
The m² hire band is discussed in the same language. The difference is haulage, stock proximity and erection shifts. Izmir Torbalı, Istanbul Tuzla / Orhanlı and Kosovo Ferizaj are separate dispatch points.
Duration locks to the project. On a one- or two-month job the unit rises; on a long site the unit falls. Extra months if the period extends, and return terms on early strip-out, are written in the quote.
On rental sets too, TS EN 12810 product and TS EN 12811 load-and-guardrail rules apply. A certificate does not replace anchors and the structural note. Wind support is not a kilogram mnemonic; the calculation is project-based.
Reach the 3B İskele team for survey, rental, sales and erection. Don’t close quantities by guesswork — we’ll pin down the right system together. Use 3biskele.com or WhatsApp for a quote.
Izmir Head Office · Torbalı / Izmir
Istanbul Factory & Warehouse · Tuzla / Orhanlı
Kosovo Warehouse · Ferizaj